Unit of Competency Code Unit of Competency Name
Core Units: |
CPCCCM2012* | Work safely at heights |
CPCPCM2039 | Carry out interactive workplace communication |
CPCPCM2040* | Read plans, calculate quantities and mark out materials |
CPCPCM2041 | Work effectively in the plumbing services sector |
CPCPCM2043 | Carry out WHS requirements |
CPCPCM2045* | Handle and store plumbing materials |
CPCPCM2046* | Use plumbing hand and power tools |
CPCPCM2047* | Carry out levelling |
CPCPCM2048* | Cut and join sheet metal |
CPCPCM2054* | Carry out simple concreting and rendering |
CPCPCM2055* | Work safely on roofs |
CPCPCM3021* | Flash penetrations through roofs and walls |
CPCPCM3022* | Weld polymer pipes using fusion method |
CPCPCM3023* | Fabricate and install non-ferrous pressure piping |
CPCPCM3024* | Prepare simple drawings |
CPCPCM3025* | Install trench support |
CPCPDR2021* | Locate and clear blockages |
CPCPDR2025* | Install stormwater and sub-soil drainage systems and drain work site |
CPCPDR2026* | Install prefabricated inspection openings and inspection chambers |
CPCPDR3021* | Plan layout and install below ground sanitary drainage systems |
CPCPDR3023* | Install on-site domestic wastewater treatment plants and disposal systems |
CPCPFS3031* | Fabricate and install fire hydrant and hose reel systems |
CPCPGS3048* | Install gas pressure control equipment |
CPCPGS3049* | Install gas appliance flues |
CPCPGS3051* | Purge consumer piping |
CPCPGS3053* | Disconnect and reconnect Type A gas appliances |
CPCPGS3054* | Calculate and install natural ventilation for Type A gas appliances |
CPCPGS3056* | Size and install consumer gas piping systems |
CPCPGS3059* | Install LPG storage of aggregate storage capacity up to 500 litres |
CPCPGS3061* | Install and commission Type A gas appliances |
CPCPSN3011* | Plan the layout of a residential sanitary plumbing system and fabricate and install sanitary stacks |
CPCPSN3022* | Install discharge pipes |
CPCPWT3020* | Connect and install storage tanks to a domestic water supply |
CPCPWT3021* | Set out and install water services |
CPCPWT3022* | Install and commission water heating systems and adjust controls and devices |
CPCPWT3025* | Install water pumpsets |
CPCPWT3026* | Install and fit off sanitary fixtures, water services and adjust water service controls |
CPCPWT3027* | Install backflow prevention devices |
CPCPRF2023* | Collect and store roof water |
CPCPRF3022* | Fabricate and install roof drainage systems |
CPCPRF3023* | Fabricate and install external flashings |
CPCPRF3024* | Install roof components |
HLTAID011 | Provide first aid |
| |
Electives Units Group A |
CPCCCM2008* | Erect and dismantle restricted height scaffolding |
CPCCCM3001 | Operate elevated work platforms up to 11 metres |
CPCPCM2049* | Cut mild steel using oxy-LPG-acetylene equipment |
CPCPCM2052* | Weld mild steel using oxy-acetylene equipment |
CPCPFS3037* | Install residential life safety sprinkler systems |
CPCPFS3038* | Test and maintain fire hydrant and hose reel installations |
CPCPIG2021* | Design domestic urban irrigation systems |
CPCPIG3021* | Set out, install and commission irrigation systems |
CPCPIG3022* | Install and commission domestic irrigation pumps |
CPCPWT3024* | Install and maintain domestic water treatment equipment |
CPCPWT3028* | Install property service |
CPCPWT3029* | Install water pipe systems |
CPCPWT3030* | Install home fire sprinkler systems |
MEM11011* | Undertake manual handling |
MEM13015 | Work safely and effectively in manufacturing and engineering |
MEM16006* | Organise and communicate information |
MEM05049* | Perform routine gas tungsten arc welding |
MEM05050* | Perform routine gas metal arc welding |
RIIWHS202E | Enter and work in confined spaces |
| |
Group B |
CPCPCM2053* | Weld using metal arc welding equipment |
CPCPGS3046* | Install LPG systems in caravans, mobile homes and mobile workplaces |
CPCPGS3052* | Maintain Type A gas appliances |
CPCPGS3055* | Install gas sub-meters |
CPCPGS3060* | Install LPG storage of aggregate storage capacity exceeding 500 litres and less than 8 kl |
CPCPGS3047* | Install LPG systems in marine craft |
| |
Group C |
CPCPDR3025* | Plan layout and install vacuum drainage systems |
CPCPSN3025* | Install pre-treatment facilities |
CPCPSN3026* | Install sewerage pumpsets |
RIIWHS202E | Enter and work in confined spaces |
RIICTT306E | Install cure in-place linings for existing pipeline systems |
| |
Group D |
CPCCCM2008* | Erect and dismantle restricted height scaffolding |
CPCCCM3001 | Operate elevated work platforms up to 11 metres |
CPCPRF2022* | Select and install roof sheeting and wall cladding |
CPCPRF2024* | Fabricate roof coverings for curved structures |
CPCPRF3021* | Receive roofing materials |
CPCPRF3025* | Install roof coverings to curved roof structures |
CPCPRF3026* | Install roof sheets, wall cladding and complex flashings |
CPCPRF3027* | Select and install a heritage roof system |
| |
Group E |
CPCPMS2021* | Assemble mechanical services components |
CPCPMS3031* | Fabricate and install steel pressure piping |
CPCPMS3032* | Select and fit insulation and sheathing |
CPCPMS3035* | Install and test ducting systems |
CPCPMS3036* | Install air handling units |
CPCPMS3038* | Install air conditioning control equipment |
CPCPMS3039* | Maintain mechanical services equipment |
| |
Group F |
CPCCCM2008* | Erect and dismantle restricted height scaffolding |
CPCCCM3001 | Operate elevated work platforms up to 11 metres |
CPCCWC2001* | Complete penetrations and flashings |
CPCCWHS2001 | Apply WHS requirements, policies and procedures in the construction industry |
CPCPCM2053* | Weld using metal arc welding equipment |
CPCPMS3033* | Install small bore heating systems |
CPCPMS3034* | Install and test medical gas pipeline systems |
CPCPMS3037* | Install and commission a single head split system air conditioning |
CPCPMS3040* | Install and maintain evaporative air-cooling systems |
CPCPMS3041* | Install domestic solid fuel burning appliances |
UEECD0007* | Apply work health and safety regulations, codes and practices in the workplace |
UEERA0049* | Install and start up single head split air conditioning and water heating heat pump systems |
UEERA0059* | Prepare and connect refrigerant tubing and fittings |
UEERA0064* | Recover, pressure test, evacuate, charge and leak test refrigerants – split systems |